Skip to main content

Table 1 The values of \(\{x_{n}\}\) with \(x_{1}=(-100,-100)\) and \(n=N=15\)

From: The method for solving the extension of general of the split feasibility problem and fixed point problem of the cutter

n

\(x_{n}=(x_{n}^{1},x_{n}^{2})\)

1

(−100.0000,−100.0000)

2

(−20.0000,−20.0000)

3

(−3.6000,−3.4000)

7

(−0.0162,−0.0053)

13

(−0.0001,0.0006)

14

(−0.0001,0.0006)

15

(0.0000,0.0006)