Skip to main content

Table 5 Earnings (dollars) and capacity of the incinerator (in tonnes/day)

From: Using concave optimization methods for inexact quadratic programming problems with an application to waste management

  Time span (k = 1) Time span (k = 2) Time span (k = 3)
\(RE_{k}^{\pm }\) [15, 20] [15, 20] [15, 20]
\(TE_{k}^{\pm }\) [500, 650] [500, 650] [500, 650]
\