Skip to main content

Table 2 Facility running cost (in dollars)

From: Using concave optimization methods for inexact quadratic programming problems with an application to waste management

  Time span (k = 1) Time span (k = 2) Time span (k = 3)
\(OP_{1k}^{\pm }\) [35, 37.5] [50, 53] [64, 65]
\(OP_{2k}^{\pm }\) [62.5, 63] [75, 77] [83.5, 87.5]
\