Skip to main content

Table 2 Facility running cost (in dollars)

From: Using concave optimization methods for inexact quadratic programming problems with an application to waste management

 

Time span (k = 1)

Time span (k = 2)

Time span (k = 3)

\(OP_{1k}^{\pm }\)

[35, 37.5]

[50, 53]

[64, 65]

\(OP_{2k}^{\pm }\)

[62.5, 63]

[75, 77]

[83.5, 87.5]