Skip to main content

Table 6 Simulation results for Huber loss function and \(\varepsilon \sim0.9N(0,1)+0.1N(0,9)\)

From: M-estimation in high-dimensional linear model

Setting

Method

EE

PE

C

IC

CP

n = 200

Oracle

10.4829

4.4694

24.0000

0

100%

p = 28

Lasso

9.1630

4.6333

18.0680

0

75.28%

m = 24

LLA

10.5706

4.4827

22.7880

0

94.95%

n = 500

Oracle

19.2618

7.1860

41.0000

0

100%

p = 45

Lasso

17.3780

7.3190

35.3500

0

86.22%

m = 41

LLA

19.2962

7.2029

40.5900

0

99.00%

n = 700

Oracle

23.6356

8.5563

49.0000

0

100%

p = 53

Lasso

21.5202

8.7148

43.4420

0

88.66%

m = 49

LLA

23.6275

8.5822

48.7120

0

99.41%