Skip to main content

Table 4 The optimal link flow and the toll charge on the link with \(\pmb{b=40}\)

From: An inexact generalized PRSM with LQP regularization for structured variational inequalities and its applications to traffic equilibrium problems

Link

Flow

Charge

1

0

0

2

12.94

0

3

40.00

251.5

4

12.94

0

5

0

0

6

40.00

1,254.1

7

34.73

0

8

32.90

0

9

0

0

10

0

0

11

0

0

12

33.95

0

13

27.06

0

14

12.94

0

15

27.06

0

16

5.27

0

17

1.83

0

18

32.90

0

19

5.27

0

20

5.27

0

21

5.27

0

22

33.95

0

23

0

0

24

12.94

0

25

40.00

1,180.9

26

32.32

0

27

34.16

0

28

0

0